圆井模具属于检查井模具其中的一种,它的使用比较广泛,圆井模具使用的是现在比较先进的无缝焊接工艺进行生产。为了保护模具的质量,圆井模具,圆形井模具,圆形检查井模具在生产完成之后会在模具的表面涂刷上一层防锈油或者是其他的保护剂,不含水分和酸性的物质。不会伤害到模具。而且在生产的时候工人都有着成熟的技术,能够快速的将模具生产出来。质量上等的观察井模具在使用的时候,运作方便,工人操作起来也很顺利。他的生期限是三年的时间,在这个时间段之内,能够大量的生产预制件。而且在模具中浇筑的一般都是强度非常高的水泥和混凝土。能够快速的成型。
The round well mould is one of the inspection well dies, which is widely used. The round well mould is produced by the advanced seamless welding process. In order to protect the quality of the mold, the surface of the mold will be coated with a layer of antirust oil or other protective agent after the completion of production, without moisture and acidic substances. It won't hurt the mold. And in the production of workers have mature technology, can quickly mold production. The mould of observation well with high quality can be operated conveniently and operated smoothly by workers. His life span is three years, during which he can produce large quantities of prefabricated parts. And in the mold pouring is generally very high strength cement and concrete. It can be rapid prototyping.
圆井模具可以通过预制工艺进行制作,也能够通过现浇技术进行生产。但是很多的工程会选择预制,因为工厂内生产的话首先制作环境是稳定的,而且生产过程顺利,能够在短时间内生产出大量的预制件。有的工程会有一些特殊的情况,比如安装困难等原因。所以会根据现场的情况在模具上面切割出孔洞在去生产。圆井模具的施工一般工程会先提前规划好需要施工的环境,然后在周围用一些隔离设施,比如说栅栏或者是塑料隔离墩等,将周围保护起来,施工人员也要做好保护措施,保证人身安全和施工的顺利进行。首先会使用到的就是小型的挖掘机,在表面进行挖掘。如果说下水井模具的长度是两米的话,需要挖掘的深度应该控制在一米八左右的距离。因为过深的话,观察是不方便的,容易出现尺寸的偏差。
The round well mould can be made by prefabrication technology or by cast-in-place technology. However, many projects will choose prefabrication, because the production environment is stable and the production process is smooth, and a large number of prefabricated parts can be produced in a short time. Some projects will have some special conditions, such as installation difficulties and other reasons. Therefore, according to the site situation, holes will be cut out on the mold to produce. For the construction of round well mould, the construction environment shall be planned in advance, and then some isolation facilities, such as fence or plastic isolation pier, shall be used to protect the surrounding area. The construction personnel shall also take protective measures to ensure personal safety and smooth construction. The first thing that will be used is a small excavator, digging on the surface. If the length of the well mould is two meters, the depth of excavation should be controlled at a distance of about 1.8 meters. Because if it is too deep, it is not convenient to observe, and the size deviation is easy to appear.